一区二区三区成人免费视频在线观看-一级做a爰片久久毛片孕妇-a一级性爱啊视频在线免费看-欧美特大一级黄片二区-欧美黄片免费AA级-欧美黄色成人一级视频-一级免费欧美在线观看视频-美国特级毛片喷水-免费播放特级黄色电影

As a TS16949:2009 certified machining parts manufacturer, we are now doing more. From late 2014, we are using MES system (Manufacturing Execution System Association)to improve our whole production manage. All the managers could know the status of how the parts are being made at the certain moment. The system also gives us the ability to recognize quality issues immediately, yielding a zero defect output to our customers.
  • 1

    Raw material

    From the moment the raw material arrives at Longteng, it has its own bar code. The material could be easy traced and well controlled first-in first-out.

  • 2

    Under production

    All the machines are connected with system. With the all-in-one PC, it shows the latest drawings, in-time workload, immediately request, etc.

  • 3

    Production Board

    Each workshop has its production board, which shows the production status every moment.

  • 4

    Inspection record

    Instead of the paper record and avoiding man-made mistakes, our on-site quality inspector is able to record the data immediately and get the result from the system itself.

  • 5

    Turnover box

    Each turnover boxes have the unique bar code, from which we could know the details.

  • 6

    Package & Shipping

    All the parts would be shipped with the bar code, so that if there is any question, we could easy find out the detail information.